Roadmap for the consideration of establishment and operation of a greenhouse gas emissions trading system in Turkey / (Record no. 200465146)

MARC details
000 -LEADER
fixed length control field 12387cam a2200337 i 4500
001 - CONTROL NUMBER
control field 200465146
003 - CONTROL NUMBER IDENTIFIER
control field TR-AnTOB
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250821111234.0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 190410t201 2016tu ad 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency TR-AnTOB
Language of cataloging eng
Description conventions rda
Transcribing agency MET.
Modifying agency DEUX
-- TR-AnTOB
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title İngilizce
050 #4 - LIBRARY OF CONGRESS CALL NUMBER
Classification number TD885.5.G73
Item number T87 2016r
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TD885.5.G73
Local cutter number (OCLC) ; Book number/undivided call number, CALL (RLIN) T87 2016r
245 00 - TITLE STATEMENT
Title Roadmap for the consideration of establishment and operation of a greenhouse gas emissions trading system in Turkey /
Statement of responsibility, etc. prepared by Ecofys; Maarten Neelis [and eleven others].
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Ankara :
Name of producer, publisher, distributor, manufacturer Republic of Turkey Ministry of Environment and Urbanisation,
Date of production, publication, distribution, manufacture, or copyright notice 2016.
Date of production, publication, distribution, manufacture, or copyright notice ©2016
300 ## - PHYSICAL DESCRIPTION
Extent 135 pages :
Other physical details illustrations, tables ;
Dimensions 28 cm
336 ## - CONTENT TYPE
Content type term text
Content type code txt
Source rdacontent
337 ## - MEDIA TYPE
Media type term unmediated
Media type code n
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Carrier type code nc
Source rdacarrier
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note CONTENTS <br/> $x 1-Introduction 1 $x 2-Emissions Trading Design Elements -<br/> An Introduction 3 $x 2.1 Why emissions trading? 3 $x 2.2 Decide on the<br/> scope 6 $x 2.2.1 Definition 6 $x 2.2.2 Analysis of design options and<br/> choices 6 $x 2.2.3 Selection of international examples 9 $x 2.2.4 Links to<br/> other design elements and miscellaneous issues 12 $x 2.2.5 Design checklist<br/> 12 $x 2.3 Set the cap 13 $x 2.3.1 Definition ".. 13 $x 2.3.2 Analysis of<br/> design options and choices 13 $x 2.3.3 Selection of international examples<br/> 16 $x 2.3.4 Links to other design elements and other key issues 19 $x 2.3.5<br/> Design checklist 19 $x 2.4 Distribute the allowances 20 $x 2.4.1 Definition<br/> 20 $x 2.4.2 Analysis of design options and choices 20 $x 2.4.3 Selection of<br/> international examples 25 $x 2.4.4 Links to other design elements and<br/> miscellaneous issues 26 $x 2.4.5 Design checklist 26 $x 2.5 Consider the<br/> use of offsets 27 $x 2.5.1 Definition 27 $x 2.5.2 Analysis of design<br/> options and choices 28 $x 2.5.3 International examples 32 $x 2.5.4 Links to<br/> other design elements and miscellaneous<br/> issues............................................. 34 $x 2.5.5 Design<br/> checklist<br/> .........................................................................................................................................<br/> 35 $x 2.6 Decide on temporal<br/> flexibility............................................................................................................<br/> 35 $x 2.6.1 Definition<br/> ........................................................................................................................................................<br/> 35 $x 2.6.2 Analysis of design options and<br/> choices.......................................................................................<br/> 36 $x 2.6.3 Selection of international<br/> examples...............................................................................................<br/> 36 $x 2.6.4 Links to other design elements and miscellaneous issues<br/> ............................................ 38 $x 2.6.5 Design<br/> checklist..........................................................................................................................................<br/> 38 $x 2.7 Address price predictability and cost containment<br/> ............................................................ 39 $x 2.7.1<br/> Definition<br/> ........................................................................................................................................................<br/> 39 $x 2.7.2 Analysis of design options and<br/> choices.......................................................................................<br/> 39 $x 2.7.3 Selection of international<br/> examples........................................................................................<br/> 42 $x 2.7.4 Links to other design elements and miscellaneous issues<br/> ............................................ 42 $x 2.7.5 Design checklist<br/> .........................................................................................................................................<br/> 42 $x 2.8 Ensure oversight and<br/> compliance...................................................................................................<br/> 43 $x 2.8.1 Definition<br/> ........................................................................................................................................................<br/> 43 $x 2.8.2 Analysis of design options and choices<br/> ......................................................................................<br/> 43 $x 2.8.3 Selection of international<br/> examples..............................................................................................<br/> 53 $x 2.8.4 Links to other design elements and miscellaneous issues<br/> ............................................ 56 $x 2.8.5 Design<br/> checklist.............................................„.....................................................................................<br/> 56 $x 2.9 Consider<br/> linking..........................................................................................................................................<br/> 56 $x 2.9.1 Definition<br/> ........................................................................................................................................................<br/> 56 $x 2.9.2 Analysis of design options and<br/> choices........................................................................................<br/> 56 $x 2.9.3 Selection of international<br/> examples..............................................................................................<br/> 60 $x 2.9.4 Links to other design elements and miscellaneous<br/> issues........................................... 61 $x 2.9.5 Design<br/> checklist..........................................................................................................................................<br/> 61 $x 3 - Policy Mapping and Policy Interactions_62 $x 3.1 Theory on policy<br/> interaction when introducing an ETS<br/> ................................................... 62 $x 1 Emissions<br/> trading as part of a wider policy<br/> mix.................................................................... 63<br/> $x 3.2 Mapping of Turkish existing and planned energy and $x climate change<br/> policies<br/> .........................................................................................................................<br/> 67 $x 3.2.1 International policies<br/> ,..............................................................................................................................<br/> 67 $x National Policies - laws and<br/> regulations......................................................................................<br/> 69 $x 3.2.3 National Policies - framework policies and<br/> strategies....................................................... 72 $x 3.3<br/> Phasing in an ETS - recommendation on the interaction $x with other<br/> policies....................................................................................................................................<br/> 80 $x 3.3.1 Energy efficiency policies<br/> ....................................................................................................................<br/> 80 $x 3.3.2 Renewable energy and other policies for the power sector<br/> ......................................... 82 $x 3.3.3 Voluntary emission<br/> reduction offset market<br/> ...........................................................................<br/> 85 $x 3.4 Conclusions - a policy roadmap for Turkey by minimizing possible<br/> $x conflicts and maximizing possible<br/> synergies........................................................................<br/> 86 $x 4 - Legal and Institutional Basis for an ETS in Turkey _87 $x 4.1<br/> Ltgal and Institutional structure of existing ETSs 87 $x 4.1.1 EU ETS<br/> legislative structure 87 $x 4.1.2 Implementation of the EU ETS In Germany<br/> and Poland.................................................. 90 $x 4.1.3<br/> Legal end Institutional structure Of the Korean and Californian ETS<br/> ................................ 95 $x 4.1.4 Legal and Institutional<br/> set-up: learnings for Turkey from $x International case<br/> studies....................................................................................................................<br/> 96 $x 4.2 Legislative and institutional basis for developing an ETS in<br/> Turkey......................... 97 $x 4.2.1 Existing legislation in Turkey<br/> with relevance to a possible ETS................................... 97 $x .<br/> . mt institutional structures in Turkey for the set-up of an<br/> ETS................................. 98 $x 4.3 Gap analysis<br/> ................................................................................................................................................<br/> 99 $x 4.4 Conclusion - recommendation for a legal and institutional set-up<br/> $x of an ETS in Turkey<br/> ..................................................................................................................................<br/> 102 $x 5 - Options, Guidance and Action Plan for an Emissions $x Trading<br/> Pilot in Turkey_103 $x 5.1 Design<br/> options.............................................................................................................................................103<br/> $x 5.1.1 Decide on the scope, starting year and length of a pilot<br/> ETS......................................103 $x 5.1.2 Set the<br/> cap....................................................................................................................................................105<br/> $x 5.1.3 Distribute the<br/> allowances....................................................................................................................108<br/> $x 5.1.4 Consider the use of<br/> offset....................................................................................................................109<br/> $x 5.1.5 Decide on temporal<br/> flexibility............................................................................................................111<br/> $x 5.1.6 Address price predictability and cost<br/> containment............................................................113<br/> $x 5.1.7 Ensure oversight and<br/> compliance...................................................................................................114<br/> $x 5.1.8 Consider<br/> linking..........................................................................................................................................118<br/> $x 5.2 Criteria for the evaluation of design<br/> options...........................................................................119<br/> $x 5.3 Evaluation of design<br/> options...............................................................................................................120<br/> $x 5.3.1 Decide on the<br/> scope.................................................................................................................................120<br/> $x 5.3.2 Set the cap 120 $x 5.3.3 Distribute the allowances 121 $x 5.3.4<br/> Consider the use of offset 121 $x 5.3.5 Decide on temporal flexibility 122<br/> $x 5.3.6 Address price predictability and cost containment 122 $x 5.3.7<br/> Ensure oversight and compliance 122 $x 5.3.8 Conclusion: possible design<br/> for an ETS pilot in Turkey 124 $x 5.4 Action plan for the set-up of a pilot<br/> ETS in Turkey 125 $x 6- Conclusion 135
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Greenhouse gas mitigation
9 (RLIN) 112242
Topical term or geographic name entry element Greenhouse gases
General subdivision Environmental aspects
9 (RLIN) 149813
Topical term or geographic name entry element Emissions trading
9 (RLIN) 81635
Topical term or geographic name entry element Environmental policy
Geographic subdivision Turkey
9 (RLIN) 16646
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Neelis, Maarten
9 (RLIN) 149814
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Ecofys
9 (RLIN) 149808
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Book
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Home library Current library Shelving location Date acquired Source of acquisition Inventory number Total Checkouts Full call number Date last seen Date shelved Koha item type Public note
    Library of Congress Classification Yeni / New Ödünç verilemez-İşlemde / Not for loan-In process Genel Koleksiyon Merkez Kütüphane Merkez Kütüphane Genel Koleksiyon / Main Collection 21/08/2025 TOBB Bağış / TOBB Donation EÜT   TD885.5.G73 T87 2016r 21/08/2025 21/08/2025 Book Donated by TOBB ETÜ Rektörlük
Devinim Yazılım Eğitim Danışmanlık tarafından Koha'nın orjinal sürümü uyarlanarak geliştirilip kurulmuştur.