000 01158 a2200325 4500
001 11756
999 _c11756
_d1471
003 TR-AnTOB
005 20200807145024.0
008 940620s1995 njua b 001 0 eng
010 _a94022418
020 _a01343633124
040 _aDLC
_cDLC
_dDLC
041 _aeng
050 0 _aTS176
_b.N36 1995
090 _aTS176 .N36 1995
100 _aNarasimhan, Seetharama L.,
_d1936-
_93987
245 0 _aProduction planning and inventory control /
_cSeetharama L. Narasimhan, Dennis W. McLeavey, Peter J. Billington.
264 1 _aEnglewood Cliffs, N.J. :
_bPrentice Hall,
_cc1995.
300 _axix, 716 p. :
_bill. ;
_c25 cm.
490 0 _aQuantitative methods and applied statistics series
500 _aRev. ed. of: Production planning and inventory control / Dennis W. McLeavey. 1985.
504 _aIncludes bibliographical references and index.
650 0 _aProduction planning
_91778
650 _aInventory control
_93991
700 _aMcLeavey, Dennis W.
_tProduction planning and inventory control.
_93988
700 _aMcLeavey, Dennis W.
_93989
700 _aBillington, Peter,
_d1948-
_93990
942 _cBK