000 01151 a2200301 4500
001 200003152
999 _c200003152
_d324
003 TR-AnTOB
005 20200807145028.0
020 _a9783639266542
040 _aTR-AnTOB
041 _aeng
050 4 _aTS157.5
_b.G85 2010
090 _aTS157.5 .G85 2010
100 1 _aGültekin, Hakan
_973211
245 1 0 _aScheduling in flexible robotic manufacturing cells :
_bthroughput optimization and cell design /
_cHakan Gültekin.
264 1 _aDeutschland :
_bVerlag ,
_c2010.
300 _ax, 193 p. ;
_c22 cm.
504 _aIncludes bibliographic references.
505 _a1. Introduction. -- 2. Literature Review. -- 3. Problem Definition. -- 4. Pure Cycles. -- 5. Cell Design. -- 6. Tooling Constraints. -- 7. Bicriteria Robotic Cell Scheduling. 8. Bicriteria Robotic Operation Allocation. -- 9. Conclusion.
650 0 _aProduction planning
_91778
650 0 _aRobots, Industrial
_92111
650 7 _aÜretim planlaması
_2etuturkob
_930419
650 7 _aRobotlar, Endüstriyel
_2etuturkob
_938545
653 _aCyclic scheduling
653 _aAutomated manufacturing
942 _cBK