245 1 0 _aBir traktör fabrikasında karışık modelli montaj hattı dengeleme – deterministik ve stokastik ölçümlere göre analizler /
_cAysın Şenel Uyanık ; thesis advisor Salih Tekin.
246 1 1 _aAnalysis of the mixed model assembly line balancing deterministic and stochastic measurements in a tractor plant
264 1 _aAnkara :
_bTOBB ETÜ Fen Bilimleri Enstitüsü,
_c2020.
300 _axv, 103 pages :
_billustrations ;
_c29 cm
336 _2rdacontent
_btxt
_atext
337 _2rdamedia
_bn
_aunmediated
338 _2rdacarrier
_bnc
_avolume
502 _aTez (Yüksek Lisans Tezi)--TOBB ETÜ Fen Bilimleri Enstitüsü Nisan 2020
520 _aMontaj hatları kitlesel taleplere göre üretilmesi hedeflenen ürünün malzemelerinin sıralı iş istasyonlarında bir araya getirilmesini sağlayan sistemlerdir. Montaj hatları ve tasarımı otomotiv sektörü başta olmak üzere beyaz eşya ve elektronik sektöründeki fabrikalarda üretimin verimliliğini arttıran başlıca unsurlardandır. Montaj hatlarının tasarımı ve dengelenmesi problemlerinin çözümleri ile ilgili deterministik, stokastik sezgisel ve bulanık yöntemler kullanılarak çok sayıda çalışmalar yapılmıştır. Bu çalışmada günlük çalışma süresi boyunca iş adımlarının operatörlere dağıtımı, bir traktör fabrikasındaki montaj hattına ait verilerle gerçekleştirilmiştir. Fabrikanın montaj hattında, birden fazla çeşit traktör modeline ait parçalar montajlandığı için karışık modelli montaj hatları incelenmiştir. Montaja ait operasyonların süresi zaman etüdü çalışmaları ile ölçülmüştür. Buna göre, çalışma sürelerinin rastgele ve işçiye bağlı olduğu gözlenmiştir. Paralel tip bir montaj hattında işçiye bağlı çalışma süreleri de rastgele olarak dikkate alınmıştır. Montaj hattında operatörler arasında eğitim eksikliği, karmaşık işlerin varlığı, çalışma motivasyonun azalması gibi faktörler nedeniyle hat duruşları yaşanmaktadır. Hat duruşları günlük üretilmesi gereken traktör adetlerinde sapmalara yol açmakta dolayısıyla fabrikada kayıplara neden olmaktadır. Birden fazla iş adımının gerçekleştiği karışık modelli bir montaj hattında çalışma süreleri arasında küçük farklılıklar olabilmektedir. Tüm kayıpları ölçebilmek için montaj hattında dengeleme analizleri kullanılmıştır. Çalışma kapsamında traktör modellerinde iş adımı farklılıkları göz önüne alınarak model tabanlı birleştirilmiş yöntem ile öncelik diyagramı elde edilmiştir. Stokastik montaj hattı dengeleme çalışması, hattaki stokastik çalışma sürelerine göre yapılmış ve analiz sonuçları deterministik sonuçlarla karşılaştırılmıştır. Stokastik çalışma sürelerini kullanımının avantajlarının yanı sıra sezgisel bir metot olan Arcus (1966) 'un önerdiği COMSOAL metodu kullanılarak, belirlenen çevrim süresinde minimum sayıda açılması gereken istasyon sayısını veren Java algoritması ile montaj hattı dengeleme probleminin çözümü için sezgisel sonuçlar elde edilmiştir. Algoritmaya göre farklı çevrim süreleri için, açılması gereken istasyon sayıları belirlenmektedir. Böylece fabrikadaki ani plan değişimlerine hazırlıklı bir hat yapısı elde edilmiştir. Montaj hattındaki dengeleme ve iş atama sonucunda elde edilen istasyon dağılımına göre, verimlilik analizleri sunulmakta ve sonuçlar değerlendirilmektedir.
520 _aAssembly lines are systems that allow the products with multiple components and, mass demands, to be manufactured together in sequential workstations. Assembly lines and design are among the main factors that increase the efficiency of production in factories in the white goods and electronics sectors, especially in the automotive sector. Numerous studies have been carried out using deterministic, stochastic heuristic and fuzzy methods related to the design and balancing problems of assembly lines. In this study, the distribution of work steps to the operators during the daily working period was carried out in a real assembly line of a tractor factory. Since the parts belonging to more than one type of tractor model are assembled in the factory assembly line, mixed model assembly lines are examined. The duration of the operations for the assembly was measured by time study studies. Accordingly, it was observed that the working times were random and dependent on the worker. In a parallel type assembly line, worker-dependent working times are also taken into account randomly. Line stoppages are experienced on the assembly line due to factors such as lack of training, the presence of complex jobs, and reduced motivation of work. Line stops cause deviations in the number of tractors that need to be produced daily, thus causing losses in the factory. In a mixed model assembly line where multiple work steps take place, there may be minor variations between operating times. Balancing analyzes were used on the assembly line to measure all losses. Within the scope of the study, considering the work step differences in tractor models, a priority diagram was obtained with the model-based unified priority diagram method. Stochastic assembly line balancing study was performed according to the stochastic working times on the line and the analysis results were compared with the deterministic results. In addition to the advantages of using stochastic working times, heuristic results have been obtained for the solution of the assembly line balancing problem with the java algorithm, which gives the minimum number of stations to be opened in the cycle time determined using the intuitive method Arcus (1966) proposed COMSOAL method. The number of stations to be opened according to the algorithm is determined at different cycle times. Thus, a line structure prepared for sudden plan changes at the factory was obtained. According to the station distribution obtained as a result of balancing and job assignment on the assembly line, efficiency analyzes are presented and the results are evaluated.
650 7 _aTezler, Akademik
_932546
653 _aKarışık modelli montaj hattı
653 _aMontaj hattı dengeleme
653 _aDeterministik ve stokastik montaj süreleri
653 _aHat dengeleme verimlilik analizleri
653 _aMixed model assembly lines
653 _aAssembly line balancing
653 _aDeterministic and stochastic assembly times
653 _aLine balance efficiency analysis
700 1 _aTekin, Salih