000 | 03240nam a22005895i 4500 | ||
---|---|---|---|
999 |
_c200456860 _d75072 |
||
003 | TR-AnTOB | ||
005 | 20231123132015.0 | ||
007 | cr nn 008mamaa | ||
008 | 210820s2022 si | s |||| 0|eng d | ||
020 | _a9789811641077 | ||
024 | 7 |
_a10.1007/978-981-16-4107-7 _2doi |
|
040 |
_aTR-AnTOB _beng _cTR-AnTOB _erda |
||
041 | _aeng | ||
050 | 4 | _aTA820.C6 | |
072 | 7 |
_aTNC _2bicssc |
|
072 | 7 |
_aSCI042000 _2bisacsh |
|
072 | 7 |
_aTNC _2thema |
|
090 | _aTA820.C6EBK | ||
100 | 1 |
_aChen, Jian. _eauthor. _4aut _4http://id.loc.gov/vocabulary/relators/aut |
|
245 | 1 | 0 |
_aShield Tunnel Cutter Replacement Technology _h[electronic resource] / _cby Jian Chen, Fanlu Min. |
250 | _a1st ed. 2022. | ||
264 | 1 |
_aSingapore : _bSpringer Nature Singapore : _bImprint: Springer, _c2022. |
|
300 | _a1 online resource | ||
336 |
_atext _btxt _2rdacontent |
||
337 |
_acomputer _bc _2rdamedia |
||
338 |
_aonline resource _bcr _2rdacarrier |
||
347 |
_atext file _bPDF _2rda |
||
490 | 1 |
_aKey Technologies for Tunnel Construction under Complex Geological and Environmental Conditions, _x2662-2912 |
|
505 | 0 | _aIntroduction -- Cutting, Wear and Replacement of Cutting Tools During Shield Tunneling -- Conventional Cutterhead & Tool-Changing Under Normal Pressure Technology -- Normal Pressure Tool Change Technology Based on Basic Pressure and Changeable Knife Design -- Stabilization Technology and Tool Change Technology for Open Face with Pressure Open -- Other Special Tool Changing Techniques. | |
520 | _aThis book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel. | ||
650 | 0 | _aEngineering geology. | |
650 | 0 | _aGeotechnical engineering. | |
650 | 0 | _aTransportation engineering. | |
650 | 0 | _aTraffic engineering. | |
650 | 0 | _aFire prevention. | |
650 | 0 | _aBuildings—Protection. | |
650 | 1 | 4 | _aGeoengineering. |
650 | 2 | 4 | _aGeotechnical Engineering and Applied Earth Sciences. |
650 | 2 | 4 | _aTransportation Technology and Traffic Engineering. |
650 | 2 | 4 | _aFire Science, Hazard Control, Building Safety. |
653 | 0 | _aTunnels -- China -- Design and construction | |
653 | 0 | _aTunneling -- Equipment and supplies | |
700 | 1 |
_aMin, Fanlu. _eauthor. _4aut _4http://id.loc.gov/vocabulary/relators/aut |
|
710 | 2 | _aSpringerLink (Online service) | |
830 | 0 |
_aKey Technologies for Tunnel Construction under Complex Geological and Environmental Conditions, _x2662-2912 |
|
856 | 4 | 0 |
_uhttps://doi.org/10.1007/978-981-16-4107-7 _3Springer eBooks _zOnline access link to the resource |
942 |
_2lcc _cEBK |